HOMENEWSEQUIPMENTPUBLIC ERRANDSECOLOGYPRICESCONTACTSABOUT US

PUBLIC ERRANDS

"Brikel" EAD is judiciary registered on 30 June 2000. The Company has been created by integration from "Briquette production plant" EAD and "Maritsa - East 1" Thermal Power Station EAD.

The complex has his technical, technological and economical motivated future. The first "Maritsa - East" power station has been put out of the National Electric Company structures during the first stage of the structural changes in the energetic system. A group of exeperts, prof. Garabed Mumdgian at the head analysed the situation of the both the productions-briquette and electricity production and evaluated the perspectives after the integration as positives.

Till now from the start of the pover station (September 1960) to June 2000, 77 474 212 113 kW/h electricity and 46 870 253 GJ heat have been produced.

The production of briquettes is 41 342 520 t. 3 May 2000 "Brikel" EAD signed the first contact for electricity sale to "NEC" EAD.

The economical vitality of the new company depends on the correct energetic and economical managment.

 

The briquette production branch of the "Brikel" EAD is the unique briquette production plant in Bulgaria. It is situated at about 5 km of Galabovo and 45 km of Stara Zagora.

On the South it is shares a border with "Rozov kladenetz" dam. The plant has been put into operation 17 October 1961 and produces coarse - grained fuel (briquettes) size H - 70/75 mm, B - 40/45 mm, D - 91 mm, Wtr (water) - 11%, Qrj (heat capacity) - 43 000 kcal/kg, Ad (ash content) - to 22%, Str (sulfur) - 3,8%. The production technology doesn't use adhesives.

The maximum annual productivity of the briquette production plant is about 1 300 000 t and fuel supplying the thermal power station is over 250 000 t.

In 1997 a new enriched fiel line getting to electricity production plant has been inroduced and established. Its coming into operation gave the posibility to abondon the drying plant of the power station and brought positive economic effect which proved to be given to evidence after the integration of "Briquette plant" and "Maritsa - East 1" thermal power station in 2000 which changed their names to "Brikel" EAD.

The Briquette production plant is the unique briquette production complex in Bulgaria.

The decision of the construction of a plant of this kind has been given to satisfy the domestic needs with coarse - grained fuel considering the reserves of young lignite coal which Bulgaria disposes in big quantity.

Mine Academy, town of Friberg - Germany made the full analyses of the briquetting capacity of the materal and the research of proper technology of the process. The project was assigned to a German designer's bureau for industrial engineering, town of Lipzic, Germany.

The construction of the plant started in 1958 and has been finished in two stages.

The construction and the process of putting the plant into operation has been accomplished by German specialists.

On 17 October 1961 the operation of the plant started with production capacities of 600 000 t annual briquette production. In 1969 the production capacities increased to 900 000 t. In 1969 has been finished the second stage of the civil works and the third one of the erection works which was the end of the project construction of the plant which actual production capacities are 1 600 000 t briquettes.

From 30 June 2000 "Maritsa - East 1" thermal power station and briquette production plant are transformed in a sole joint-stock company which has the following range of activities:
- electricity production, heat production, traffic and distribution of heat.
- briquette production, chippings production and high grade fuel production from lignite coal as raw material and sale of them.