Electricity production

“Electricity production” branch is a successor of TPP “Maritsa – East 1” and in fact is a thermal power plant. It is the first electric power plant of the “Maritsa – East” Power Complex.
The power plant has been designed by “Toploenergoproekt” – Moscow city, in collaboration with “Energoproekt”, Sofia city.
“Electricity production” branch is in the possession of the following equipment:
– six drum steam generators type BKZ-210-140-FB, made by Bernaul Boiler Plant with parameters of reheated steam t = 535°C and p=137 bar. The same work in a collector scheme and can supply, each separately and all together through a main steam collector, the installed turbogenerators.
– four steam turbines VPT-50-4 made by Ecaterininburg Turbine Plant.
The heat supply part of the power plant consists of two industrial heating steam pipes satisfying the needs of the Briquette plant which produces briquettes and for heating of Galabovo town. The rated capacity of the industrial steam extraction is 118 tons/hour.
The installed steam generators in the power plant are BKZ-210-140-FB drum type with free circulation, П-shape partner and two-sided (by air) flue gas discharge.
The combustors are designed for burning of low heat content lignite coal with planned calorific value of 2200 kcal/kg.

The four turbines, type VPT-5-4 are active with rated capacity of 50 MW at 3000 rpm with one industrial and two district heating steam extractions.
The generators, type TV 60-2 have rated power of 60 MW and rated voltage of 6 kV and they were made in “Electrosila”-Sankt Peterburg plant. The power transformers are with two windings, type TDG-60 000/110 – 2 pieces, and type TDG-75 000/110 – 2 pieces. They are located in an Outdoor Distribution Area – ORU 110 kV. From ORU – 110 kV, production electrical power is exported for substation “Maritsa-East”, Galabovo town, and for “Troyanovo-3” pit.

Turbogenerators 1 and 2 are the two power sources for the Main Distribution Area – GRU 6 kV. From the distribution Area GRU are supplied other large local consumers of electrical power, such as the Base for Repair of Electrical Equipment – Galabovo town and the pump station of TPP “Maritsa-East 3”. The control and monitoring of the electric units is realized by the Main Control Room in the GRU building – 6 kV (Main Distribution Area), on the territory of the ORU (Outdoor Distribution Area).

Ash and slag are removed by a hydraulic system. Nowadays, ash and slag are poured into three of the sections.
For the purpose, a circulation pumping station is built with five vertical propeller circulation pumps OP 2-110-50 type.
In the chemical plant of “Brikel” EAD, there is implemented manufacturing of chemically desalinated water. The water is supplied from Sazliika river.

DESCRIPTION
І.MAIN BUILDING
1.Turbine hall
2.Deaerator section
3.Bunker section
4.Boiler section
5.Outdoor site for flue gas fans
6.Switchgear for electric precipitators
7.Stack
ІI.ELECTROTECHNICAL STRUCTURES
8.Electric control room
9.Outdoor distribution area – 6/110kV
10.Main distribution area – 6kV
11.Complex distribution area – 6kV
12.Distribution area medium voltage – 0,4kV
ІII.STRUCTURES OF COAL SUPPLY SYSTEM
13.Uncovered unloading
14.Coal crusher building
15.Coal transport trestles – 1st uplift
16.Coal transport trestles – 2nd uplift
17.Trestles from briquette production
18.Trestles stations № 1,2,3,4
19.Coal supply galleries
20.Trestles and galleries to outdoor coal storage
21.Trestle for dry fuel supply
22.Outdoor coal storage
ІV.ІV. STRUCTURE FOR SERVICE WATER SUPPLY
23.Bank pump station
24.Switching chamber
25.Open air outgoing channel
V.SERVICE BUILDING AND STRUCTURES
26.Water treatment plant
27.Turnery workshop to OSK (Unified auxiliary building)
28.Pump station for heavy fuel oil
29.Heavy fuel oil tanks
30.Oil facility
31.Outdoor oil storage
32.OSK (Unified auxiliary building)
33.Open site for hydrogen receivers
34.Dredger – pump station
35.Compressed – air station
VI.AUXILIARY BUILDINGS AND STRUCTURES
36.Office building
37.Walkway
38.Security building and health center
39.Amenities building
40.Administrative building
41.Garage
42.Carwash
43.Condensate tanks
44.Repair shop
45.Accumulator battery
46.Bathroom
47.Garage for bulldozers
48.Restaurant
49.Covered storage
50.Building of SCB
51.Bus stop
52.Boiler station for heating supply
53.Fire-fighting station
54.Garage for electric trucks
55.Tools workshop